| Pátio | safety tunnel, roadway, sidewalks |
|---|---|
| Local | Noiraigue, Switzerland |
| Subcategoria | TÚNEL |
| Aplicação |
The project first includes the construction of a safety tunnel parallel to the existing tunnel, connected by six cross-passages serving as emergency exits.
Afterwards, the tunnel will be refurbished with the complete renovation of the drainage systems, the roadway, the sidewalks, and the electromechanical equipment. |
| Datas inicial e final | 2024/2026 |
| Tipo de aplicação | Impermeabilização |
| Empresas instaladoras | Consortium CNTCL (Infra tunnel, Bieri Grisoni, Facchinetti, Bernasconi) |
| Arquitetos | BG Ingénieurs Conseils SA, Neuchâtel | OPAN concept SA, Neuchâtel |
| Gerente de projetos | Canton of Neuchâtel |
| Coordenação da MAPEI | Alexandre Perona |