| Pátio | 70 tonnes of Mapegrout Easy Flow were applied to the inner sides of the tunnel vault. |
|---|---|
| Local | Arrissoules, Switzerland |
| Subcategoria | TÚNEL |
| Aplicação | The Arrissoules tunnel is the second longest tunnel on the A1. The four-lane tunnel with two tubes is located between the junctions of Estavayer-le-Lac and Yverdon-les-Bains. The tunnel is 2 987 m long. |
| Tipo de aplicação | Reabilitação de betão |
| Empresas instaladoras | Infra Tunnel SA |
| Arquitetos | Bureau Ingénieur BG – 1001 Lausanne |
| Gerente de projetos | OFROU Confédération Suisse |
| Coordenação da MAPEI | Alexandre Perona |