| Pátio | The existing gallery was extended by 320 metres with the new building. |
|---|---|
| Local | Disentis, Switzerland |
| Subcategoria | TÚNEL |
| Aplicação | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
| Datas inicial e final | 2021 |
| Tipo de aplicação | Pavimentação |
| Empresas instaladoras | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
| Gerente de projetos | Kanton Graubünden |
| Coordenação da MAPEI | Marco Jungi |