| Pátio | Huawei housing project |
|---|---|
| Local | Dongguan, China |
| Subcategoria | APARTAMENTOS |
| Construído em | 2011 |
| Aberto em | 2013 |
| Aplicação | Mapei products have had an important role in the construction of this big housing project.Used Keraquick to bond 600x600 artificial marble flooring, Adesilex P9 and Kerabond to bond tiles. |
| Tipo de aplicação | Construção nova |
| Empresa empreiteira | CSCEC 5th Branch Company |
| Empresas instaladoras | SDCIC |
| Arquitetos | CADRG,CEEDI, NIKKEN SEKKEI |