Pátio | car park flooring |
---|---|
Local | Dubai, United Arab Emirates |
Subcategoria | PARQUE DE ESTACIONAMENTO |
Construído em | 2024 |
Aberto em | 2024 |
Aplicação | The scope involved refurbishment of the basement car park flooring where the existing epoxy coating was peeling off and surface cracks were visible. |
Datas inicial e final | 2024 |
Tipo de aplicação | Pavimentos |
Proprietário | ARCO Turnkey Solutions Llc |
Empresas instaladoras | Gecko Middleeast Technical Services Llc |
Arquitetos | Young Engineering Llc |
Coordenação da MAPEI | Ashok |