| Pátio | car park flooring |
|---|---|
| Local | Dubai, United Arab Emirates |
| Subcategoria | PARQUE DE ESTACIONAMENTO |
| Construído em | 2024 |
| Aberto em | 2024 |
| Aplicação | The scope involved refurbishment of the basement car park flooring where the existing epoxy coating was peeling off and surface cracks were visible. |
| Datas inicial e final | 2024 |
| Tipo de aplicação | Pavimentos |
| Proprietário | ARCO Turnkey Solutions Llc |
| Empresas instaladoras | Gecko Middleeast Technical Services Llc |
| Arquitetos | Young Engineering Llc |
| Coordenação da MAPEI | Ashok |