| Pátio | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
|---|---|
| Local | Hérémence, Switzerland |
| Subcategoria | HOTEL |
| Aplicação | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
| Datas inicial e final | 2022 |
| Tipo de aplicação | Pavimentos/revestimentos |
| Arquitetos | Mijong Architecture Design |
| Gerente de projetos | Grande Dixence SA |
| Coordenação da MAPEI | Marcello Maieron |