Bereich | Epic Systems Corporate Campus |
---|---|
Standort | Madis, USA |
Projektart | SCHULE |
Durchgeführte Arbeiten | Epic Systems Corporate Campus |
Art der Anwendung | Neubauten, Betonzusatzmittel |
Auftragnehmer/Generalunternehmen | J.H. Findorff & Son, Inc. |
Architekt/Planer | Cuningham Group & Zimmer Gunsul Frasca Architect |
Beschreibung |
Project Engineer: Magnusson Klemincic Ready Mix Supplier: Wingra Redi-Mix Project Facts: Unique award winning project located on 350 acres of rolling hills near Madison, WI. Project includes a three-story office building structured over a below grade, three-level post-tensioned underground parking ramp. Due to occupancy requirements by the owner, four office buildings and one parking ramp were constructed on a parallel schedule instead of a consecutive schedule. This fast track schedule entailed using high performance concrete to ensure the schedule was met. This project utilized 35,000 cy of poured in-place concrete. 20 different mix designs were used throughout this project. |
Sie wollen wissen, was es Neues gibt bei Mapei?
Melden Sie sich einfach für unseren Newsletter oder unser Magazin Realtà Mapei an.
Copyright © 2025 MAPEI SUISSE SA. Alle Rechte vorbehalten
MAPEI SUISSE SA, Route Principale 127, 1642 Sorens (Schweiz)