| Cantiere | 80.000 square meters floors of carpark |
|---|---|
| Località | Beijing, Cina |
| Sottocategoria | GARAGE |
| Costruito nel | 2017 |
| Inaugurato nel | 2019 |
| Intervento | supplying products to lay cementitious floors in the carpark of the west wing |
| Inizio e fine dei lavori | 2019 |
| Tipo di intervento | Applicazione di pavimenti in resina |
| Committente | Shouzhong Investment Management Co. Ltd |
| Impresa appaltatrice | China Construction Eighth Engineering Bureau |
| Imprese esecutrici | Henan Jian’An Waterproof and Anticorrosive Engineering Co.,Ltd |
| Specialisti coinvolti nei lavori | Joint Design Team including Zaha Hadid Architects, ADP Ingénierie (ADPI), BIAD (Beijing Institute of Architectural Design) and CACC (China Airport Construction Group Corporation), Beijing Architectural Design and Research Institute |
| Coordinatore MAPEI | Guo Ming, Mapei Construction Materials (Guangzhou) Co. Ltd. |
Qui puoi scaricare tutti i documenti relativi al progetto