| Cantiere | car park flooring |
|---|---|
| Località | Dubai, Emirati Arabi |
| Sottocategoria | GARAGE |
| Costruito nel | 2024 |
| Inaugurato nel | 2024 |
| Intervento | The scope involved refurbishment of the basement car park flooring where the existing epoxy coating was peeling off and surface cracks were visible. |
| Inizio e fine dei lavori | 2024 |
| Tipo di intervento | Posa di pavimenti |
| Committente | ARCO Turnkey Solutions Llc |
| Imprese esecutrici | Gecko Middleeast Technical Services Llc |
| Progettisti | Young Engineering Llc |
| Coordinatore MAPEI | Ashok |