| Cantiere | CAF subfloor |
|---|---|
| Località | Meinisberg, Svizzera |
| Sottocategoria | SCUOLA |
| Intervento |
In the extension building of the Meinisberg school, a new CAF subfloor was installed to create a stable and even foundation for the subsequent floor coverings.
Die Ausführung sorgt für hohe Belastbarkeit und eine langlebige Basis, die den Anforderungen des Schulbetriebs gerecht wird. |
| Inizio e fine dei lavori | 2024 |
| Tipo di intervento | Posa di pavimenti |
| Imprese esecutrici | Brodbeck AG, Biel |
| Progettisti | Skop AG, Zurich |
| Specialisti coinvolti nei lavori | Municipality of Meinisberg |
| Coordinatore MAPEI | David Dellenbach |