| Cantiere | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
|---|---|
| Località | Hérémence, Svizzera |
| Sottocategoria | HOTEL |
| Intervento | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
| Inizio e fine dei lavori | 2022 |
| Tipo di intervento | Pavimenti |
| Progettisti | Mijong Architecture Design |
| Specialisti coinvolti nei lavori | Grande Dixence SA |
| Coordinatore MAPEI | Marcello Maieron |