The SBB train repair hall was extended and the floor had to be recoated. The floor at platform level was coated with Mapecoat TNS Extreme, as a large part of the surface consisted of tamped asphalt slabs. The working pits were coated with Mapecoat I 24.
Der Boden auf Perronhöhe wurde mit Mapecoat TNS Extreme beschichtet, da ein Grossteil der Fläche aus Stampfasphalt-Platten bestand. Die Arbeitsgruben wurden mit Mapecoat I 24 beschichtet. |
| Inizio e fine dei lavori | 2023 |
| Tipo di intervento | Preparazione sottofondi |
| Imprese esecutrici | Anliker AG, Birsfelden |
| Specialisti coinvolti nei lavori | SBB |