Cantiere | 6.5 Km Twin Tunnel. |
---|---|
Località | Gangangir, Srinagar, India |
Sottocategoria | METRO |
Costruito nel | 2018 |
Inaugurato nel | 2018 |
Intervento | a small 500 sqm waterproofing job was awarded for above portal application of PVC Membrane. Entire tunnel waterproofing to begin end of this year (2018). Shotcrete has been entirely catered by MAPEI Admixture, accelerators and Polypropylene Fibres. |
Tipo di intervento | Additivi, Costruzioni in sotterraneo, Impermeabilizzazione |
Impresa appaltatrice | Il&Fs / Apco Infratech – Titan Jv |
Distributore MAPEI | Mapei India Ltd |
Credits | Sambhav Chawla |
Direttore lavori | Mr. Shista Prasad |