 Omo River, Ethiopia
                                
                                    Omo River, Ethiopia
                                
                             
                            | Yard | protection system for the lake-side face | 
|---|---|
| Location | Omo River, Ethiopia | 
| Subcategory | DAM | 
| Built in | 2006 | 
| Opened in | 2016 | 
| Application | supplying admixtures for concrete and products for waterproofing joints and concrete surfaces | 
| Start and finish date | 2011/2015 | 
| Application Type | Waterproofing systems | 
| Client | Ethiopian Electric Power Company | 
| Contractor company | Webuild Group | 
| Architects | Studio Pietrangeli | 
| MAPEI Coordination | Pasquale Zaffaroni and Roberto Saccone, Mapei SpA (Italy) | 
Here you can download all documents related to this project
 
                                 
                                 
                                 
                                 
                                 
                                 
                                 
                                 
                                    