MAPECOAT I 600W

Two-component transparent epoxy primer in water dispersion.
TECHNICAL DATA:
Consistency of mix: fluid.
Colour of mix: opaline.
Mixing ratio: comp. A: comp. B = 2.3 : 3.6.
Workability time: 2-3 hours.
Dust dry at +23°C and 50% R.H.: 3-4 hours (first coat); 6-8 hours (second coat).
Final hardening time: 7 days.
Application temperature range: from +8°C to +35°C.
Storage: 24 months in its original sealed packaging.
Application: roller, spray or airless spray.
Consumption: 300-500 g/m², depending on the absorbency rate of diluted product.
Packaging: 5.9 kg kits and 11.8 kg kits (A + B).

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download

Last Projects MAPECOAT I 600W

Category icon COMMERCIAL FACILITIES

2018/2019

Cityplaza One

Taikoo Shing, Hong Kong

Waterproofing

Category icon RESIDENTIAL BUILDINGS

2018

Sol Acres Condominium

Singapore

Solutions for sports flooring

Category icon SPORT FACILITIES

2016/2017

One Life Gym

Beit Chabeb, Lebanon

Solutions for sports flooring

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2018

Antonine Sisters School

Ghazir, Lebanon

Solutions for sports flooring

Keep in touch

Subscribe to our newsletter to get Mapei news