NZT05 - System for the Preparation of Concrete Prior to the Installation of Floating Engineered Timber Flooring

Commercial building
Internal flooring
Installation of wooden flooring; Application of finish for wooden flooring

Please download the Work Method Statement PDF for the complete list of suitable products and installation information

Products

1
Properly prepared concrete substrate
2
Primer
3
Moisture resistant levelling compound
4
Plastic film
5
Engineered timber planks
Work Method Statement
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news