Al Habtoor City (al Habtoor palace)

Location icon Dubai, United Arab Emirates
Ref #: 5829
Category: COMMERCIAL FACILITIES

Construction

Yard st. Regis, Westin & W Hotel
Location Dubai, United Arab Emirates
Subcategory HOTEL/INN
Built in 2013
Opened in 2016
Application supply of products for waterproofing, ceramic and stone installation
Start and finish date 2013/2016
Application Type New building
Client Al Habtoor Group LLC
Installer companies HLG Contracting; AHK International, Al Shirawi (impermeabilizzazione) Marmi Group, Dar Al Rokham (posa marmo), GCS (massetti)
Architects Khalib & Alami Consolidated Engineering Company
Specialists involved Khalib & Alami Consolidated Engineering Company
MAPEI Coordination Bachir A Abdallah, Shatha Weldali, Hany Al Assal, Ian Gregory (Mapei Construction Chemicals LLC)

Additional Attachments

Here you can download all documents related to this project

Product used for the project

KERAFLEX MAXI S1
KERAFLEX MAXI S1
High-performance, deformable cementitious adhesive with no vertical slip,…
MAPELASTIC SMART
MAPELASTIC SMART
Two-component, high-flexibility cementitious mortar, applied by brush or by…
MAPETEX SEL
MAPETEX SEL
Macro-holed, non-woven polypropylene fabric for reinforcing waterproofing…
PLANICRETE
PLANICRETE
Synthetic-rubber latex for cementitious mixes. Applications: Admixture to…
PLANIGROUT 300
PLANIGROUT 300
Three-component fluid epoxy mortar for anchorage work. TECHNICAL DATA: Maximum…
TOPCEM
TOPCEM
Special normal-setting, quick-drying (4 days), controlled-shrinkage hydraulic…
Product not found
Product not found
Product not found
Product not found
Product not found

Keep in touch

Subscribe to our newsletter to get Mapei news