Al Habtoor City (al Habtoor palace)

Location icon Dubai, United Arab Emirates
Ref #: 5829
Category: COMMERCIAL FACILITIES

Construction

Yard st. Regis, Westin & W Hotel
Location Dubai, United Arab Emirates
Subcategory HOTEL/INN
Built in 2013
Opened in 2016
Application supply of products for waterproofing, ceramic and stone installation
Start and finish date 2013/2016
Application Type New building
Client Al Habtoor Group LLC
Installer companies HLG Contracting; AHK International, Al Shirawi (impermeabilizzazione) Marmi Group, Dar Al Rokham (posa marmo), GCS (massetti)
Architects Khalib & Alami Consolidated Engineering Company
Designers (for works) Khalib & Alami Consolidated Engineering Company
MAPEI Coordination Bachir A Abdallah, Shatha Weldali, Hany Al Assal, Ian Gregory (Mapei Construction Chemicals LLC)

Additional Attachments

Here you can download all documents related to this project

Product used for the project

KERAFLEX MAXI S1

KERAFLEX MAXI S1

High-performance, deformable cementitious adhesive with no vertical slip,…
Stone
Internal
New Construction : No
MAPELASTIC SMART

MAPELASTIC SMART

Two-component, high-flexibility cementitious mortar, applied by brush or…
Internal
New Construction : No
MAPETEX SEL

MAPETEX SEL

Macro-holed, non-woven polypropylene fabric for reinforcing waterproofing…
Internal
New Construction : No
PLANICRETE

PLANICRETE

Synthetic-rubber latex for cementitious mixes. Applications: Admixture to…
Internal
New Construction : No
PLANIGROUT 300

PLANIGROUT 300

Three-component fluid epoxy mortar for anchorage work. TECHNICAL DATA:…
Internal
New Construction : No
TOPCEM

TOPCEM

Special normal-setting, quick-drying (4 days), controlled-shrinkage…
Internal
New Construction : No

Keep in touch

Subscribe to our newsletter to get Mapei news