| Yard | New wood-look PVC flooring was laid on 664 m2. |
|---|---|
| Location | Villars-sur-Glâne, Switzerland |
| Subcategory | CRECHE |
| Application | The floor of the Cap Canaille day care centre was renovated. The existing tiles were sanded down and spot filling was carried out with Planiprep Fast Track. |
| Start and finish date | 2021 |
| Application Type | Floor/wall coverings |
| Architects | FACE à FACE à Genève |
| Specialists involved | Cap Canaille du groupe Babilou |
| MAPEI Coordination | Marcello Maieron |