Eggenberg beer factory

Location icon Český Krumlov, Czech Republic
Ref #: 201616
Category: PRODUCTION AND SERVICES

Construction

Yard factory
Location Český Krumlov, Czech Republic
Subcategory Brewery
Built in 2016
Opened in 2016
Application ceramics installation and grouting
Start and finish date 2016
Application Type Floor/wall coverings
Client Investment company CB Management
Installer companies TPI CI s.r.o.
MAPEI Distributor SIKO Koupelny a.s.
Project Manager Ing. Daniel Břečka

Product used for the project

ADESILEX PG4
ADESILEX PG4
TECHNICAL DATA: Mixing ratio: comp. A : comp. B = 3 : 1. Pot life of mix: 70…
KERAFLEX MAXI S1
KERAFLEX MAXI S1
TECHNICAL DATA: Pot life of mix: more than 8 hours. Open time: > 30 minutes.…
KERAPOXY
KERAPOXY
Two-component, high-performance, anti-acid epoxy mortar and adhesive with no…
KERAPOXY ADHESIVE
KERAPOXY ADHESIVE
TECHNICAL DATA: Pot life of mix: 45 minutes. Open time: 60 minutes. Set to…
MAPECOAT I 24
MAPECOAT I 24
Epoxy paint for acid-resistant coating of concrete surfaces. Mapecoat I 24 may…
PRIMER SN
PRIMER SN
TECHNICAL DATA: Mixing ratio: component A : component B = 80 : 20. Colour of…
MAPEGUM EPX / MAPEGUM EPX-T
MAPEGUM EPX / MAPEGUM EPX-T
Product not available for this market,
contact us
ULTRAPLAN
ULTRAPLAN
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news