| Yard | pools and wet rooms |
|---|---|
| Location | Flitwick, Bedfordshire, United Kingdom |
| Subcategory | SPORT CENTER |
| Application | installation of ceramics and wet rooms |
| Start and finish date | 2016 |
| Application Type | Floor/wall coverings |
| Client | Stevenage Leisure Ltd. |
| Contractor company | Tiletec Group |
| Installer companies | Tiletec Group |
| Other | The £14.7m new build leisure centre comprises a 25m2 competition pool, 13m2 learner pool (with raised floor) and confidence water pool. In addition to the pools, there are four discrete changing/shower areas which have been fully tiled; wet change, dry change, outside change and fitness suite changing, along with floor tiling to circulation areas and staircases amounting to a further 750m2 of tiling. |