| Yard | pools and locker rooms |
|---|---|
| Location | London, United Kingdom |
| Subcategory | SCHOOL |
| Opened in | 2016 |
| Application | waterproofing and ceramics installation |
| Application Type | Floor/wall coverings |
| Contractor company | Jerram Faulkus |
| Installer companies | Tiletec Group |
| Other |
Throughout the extensive project, Mapei systems were specified from the substrate to the finishing materials, in order to provide a warrantable system build-up. The total application included 2,500 m2 of Mapei products from screed binders, render substrates and a range of floor and wall adhesives. The new two-storey building consists of a six lane competition swimming pool and wet changing facilities on the ground floor. The second floor comprises of a fitness suite with the project including a re-fit of existing sports hall and dry changing areas. |