Santa Barbara Eco Beach Resort

Location icon Ponta Delgada, Portugal
Ref #: 50081
Category: TOURISM AND WELLNESS

Construction

Yard apartments and hotel
Location Ponta Delgada, Portugal
Subcategory RESORT
Built in 2014
Opened in 2015
Application waterproofing and ceramics installation in the pools
Application Type Waterproofing systems
Client North Shore Resorts
Contractor company RPM
Installer companies RPM
Architects Montero Resende e Sousa Arquitectos Lda.
MAPEI Distributor LivePlace by Palegessos
Project Manager Arq Fernando Monteiro

Product used for the project

KERAFLEX MAXI S1
KERAFLEX MAXI S1
TECHNICAL DATA: Pot life of mix: more than 8 hours. Open time: > 30 minutes.…
KERALASTIC T
KERALASTIC T
TECHNICAL DATA: Open time: 50 minutes. Waiting time before grouting: 12 hours.…
MAPEBAND
MAPEBAND
Technical data: Length: 50 m. Width: 120 mm. ULTIMATE ELONGATION: > 400%.…
MAPENET 150
MAPENET 150
TECHNICAL DATA: Colour: blue. Weight: 150 g/m² ± 5%. Mesh size: 4x4.5 mm.…
KERAPOXY CQ
KERAPOXY CQ
Product not available for this market,
contact us
MAPELASTIC
MAPELASTIC
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news