| Podrobnosti | safety tunnel, roadway, sidewalks |
|---|---|
| Lokacija | Noiraigue, Switzerland |
| Kategorija | TUNNEL |
| Opis opravljenih del |
The project first includes the construction of a safety tunnel parallel to the existing tunnel, connected by six cross-passages serving as emergency exits.
Afterwards, the tunnel will be refurbished with the complete renovation of the drainage systems, the roadway, the sidewalks, and the electromechanical equipment. |
| Datum začetka in konca | 2024/2026 |
| Več o projektu | Hidroizolacija |
| Podizvajalec | Consortium CNTCL (Infra tunnel, Bieri Grisoni, Facchinetti, Bernasconi) |
| Projektant/ Arhitekt | BG Ingénieurs Conseils SA, Neuchâtel | OPAN concept SA, Neuchâtel |
| Vodja projekta | Canton of Neuchâtel |
| Koordinacija MAPEI | Alexandre Perona |
Tukaj se lahko naročite na Mapei novičnik in prejemate naše novice