Podrobnosti | The existing gallery was extended by 320 metres with the new building. |
---|---|
Lokacija | Disentis, Switzerland |
Kategorija | TUNNEL |
Opis opravljenih del | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Datum začetka in konca | 2021 |
Več o projektu | Ceste in poti |
Podizvajalec | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Vodja projekta | Kanton Graubünden |
Koordinacija MAPEI | Marco Jungi |