| Saha | 80.000 square meters floors of carpark |
|---|---|
| Konum | Пекін, China |
| Alt kategori | PARKING |
| İnşa edildiği tarih: | 2017 |
| Açıldığı tarih: | 2019 |
| Uygulama | supplying products to lay cementitious floors in the carpark of the west wing |
| Başlangıç ve bitiş tarihi | 2019 |
| Uygulama Türü | Cemetitious and resin floor coverings |
| Müşteri | Shouzhong Investment Management Co. Ltd |
| Yüklenici şirket | China Construction Eighth Engineering Bureau |
| Tesisatçılar | Henan Jian’An Waterproof and Anticorrosive Engineering Co.,Ltd |
| Tasarımcılar (çalışmalar için) | Joint Design Team including Zaha Hadid Architects, ADP Ingénierie (ADPI), BIAD (Beijing Institute of Architectural Design) and CACC (China Airport Construction Group Corporation), Beijing Architectural Design and Research Institute |
| MAPEI Koordinasyonu | Guo Ming, Mapei Construction Materials (Guangzhou) Co. Ltd. |
Bu projeyle ilgili tüm belgeleri buradan indirebilirsiniz