PLANOPUR

PLANOPUR

Two-component, self-levelling, flexible, polyurethane levelling compound for all types of substrate, especially the deformable type.
TECHNICAL DATA:
Workability time: 20-25 minutes.
Application temperature range: from +10°C to +30°C.
Set to light foot traffic: after approximately 12 hours.
Waiting time before laying: approx. 15 hours.
Colours: Comp. A: beige, comp. B: brown.
Application: rake or smooth metal trowel.
Storage: 24 months.
Consumption: approx. 1.5 kg/m² per mm of thickness.
Packaging: 14 kg units.

İlgili belgeler

Teknik veri sayfası
İndir

İrtibatta olalım

Mapei'den haber almak için bültenimize abone olun