System for the Installation of Engineered Timber Flooring Over Difficult Substrates - H03

This work method statement covers the system to install tiles over difficult substrates.

System for the Repair and Protection of Steel Reinforced Concrete - H08

This work method statement covers the system for repair and protection of steel reinforced concrete.

System for the Installation of Ceramic, Porcelain or Stone Tiles on Existing Tiles - H04

This work method statement covers the system to install tiles over existing tiles in areas where…

System for the Fast Track Installation of Tiles in Internal Wet Areas - H07

This work method statement covers the fast track systems for waterproofing and tiling bathrooms.

System for the Installation of Tiles over a Timber/Wood-Based Substrate - H06

This work method statement covers the system to install tiles over a wood-based substrate in areas where…

System for the Installation of Engineered Timber Flooring Over a Concrete Substrate - H01

This work method statement covers the system to install tiles over uneven concrete.

System for the Installation of Tiles in Internal Wet Areas - H05

This work method statement covers the system to install ceramic/stone tiles in internal wet areas.

System for the Installation of Timber Flooring over a Moisture Vapour Barrier - H02

This work method statement covers the system to install tiles over uneven concrete.

Hardware Catalogue 

To access the latest hardware catalogue, click on the download button below

Keep in touch

Subscribe to our newsletter to get Mapei news