R05 - System for the Installation of LVT over Concrete with High Residual Moisture Content

New building
Internal flooring
Installation of textile flooring; Installation of resilient flooring; Installation of LVT

 

Products

1
Properly prepared concrete substrate
2
Moisture Vapour Barrier
3
4
Levelling Compound
6
LVT Floor Covering

Application procedure

Consult all technical phases related to this solution

NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news