Proposed Composite Development at Fuk Chak St. & Li Tak St.

Location icon Tai Kok Tsui, Hong Kong

Construction

Product used for the project

ADESILEX P9
ADESILEX P9
High-performance cementitious adhesive with no vertical slip and extended open…
KERACOLOR FF
KERACOLOR FF
TECHNICAL DATA: Pot life: approx. 2 hours. Waiting time before finishing: 10-20…
KERAFLEX
KERAFLEX
High-performance cementitious adhesive with no vertical slip and extended open…
PRIMER G
PRIMER G
Synthetic resin-based primer in water dispersion. Applications: Treating gypsum…
MAPETOP N AR6
MAPETOP N AR6
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news