Tuen Mun – Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section

Location icon Artificial Island of Tung Chung, Hong Kong

Construction

Product used for the project

ADESILEX P9
ADESILEX P9
High-performance cementitious adhesive with no vertical slip and extended open…
KERACOLOR FF
KERACOLOR FF
TECHNICAL DATA: Pot life: approx. 2 hours. Waiting time before finishing: 10-20…
PLANICRETE
PLANICRETE
Consumption – for the preparation of adhesive slurries: 100-150 g/m2; – for the…

Keep in touch

Subscribe to our newsletter to get Mapei news