Forchbahn of the tunnel in Zumikon

Location icon Zumikon
N.º de ref.: 4640
Categoría: MEDIOS DE TRANSPORTE

Construcción

Detalles From 2022 to 2024, both tracks will be completely replaced and new points with a larger radius will be installed. Instead of the existing track structure with ballast and wooden sleepers, a solid concrete track will be installed.
Ubicación Zumikon
Subcategoría TÚNEL
Aplicación The Forchbahn tunnel between Waltikon and Neue Forch, built in the 1970s, was renovated. Damage to the building fabric as well as various modernisation works were necessary. The work was carried out during ongoing railway operations.
Fecha de inicio y finalización 2022/2024
Tipo de aplicación Carreteras
Empresas instaladoras Diamantbohr AG
Gestor de proyectos Forchbahn AG
Coordinación de MAPEI Reto Stutz

Producto usado en el proyecto

ADESILEX PG2
ADESILEX PG2
Product not available for this market,
contact us
CARBOPLATE S
CARBOPLATE S
Product not available for this market,
contact us

Manténgase en contacto

Suscríbase a nuestro boletín para recibir las noticias de Mapei