Forchbahn of the tunnel in Zumikon

Location icon Zumikon, Switzerland
Ref #: 4640
Kategorija: PRIJEVOZ

Građevinski radovi

Područje zahvata From 2022 to 2024, both tracks will be completely replaced and new points with a larger radius will be installed. Instead of the existing track structure with ballast and wooden sleepers, a solid concrete track will be installed.
Lokacija Zumikon, Switzerland
Podkategorija TUNNEL
Opis izvođenih radova The Forchbahn tunnel between Waltikon and Neue Forch, built in the 1970s, was renovated. Damage to the building fabric as well as various modernisation works were necessary. The work was carried out during ongoing railway operations.
Datum početka i završetka 2022/2024
Vrsta radova Održavanje cesta i urbanističko projektiranje
Izvođač radova Diamantbohr AG
Voditelj projekta Forchbahn AG
MAPEI koordinator Reto Stutz

Proizvod korišten na projektu

ADESILEX PG2
ADESILEX PG2
Tiksotropno epoksi ljepilo s produženim vremenom upotrebe. Adesilex PG2 je…