Područje zahvata | The bridge was repaired. |
---|---|
Lokacija | Schoried, Switzerland |
Podkategorija | BRIDGE |
Opis izvođenih radova | The bridge, built in 1934, was repaired in 2020. |
Datum početka i završetka | 2020 |
Vrsta radova | Ojačanje konstrukcije |
Izvođač radova | Bürgi Bau AG |
MAPEI koordinator | Stephan Moosmann |