PRIMER SN

Two-component epoxy primer with fillers.
May be coloured with MAPECOLOR PASTE.
TECHNICAL DATA:
Mixing ratio: component A : component B = 80 : 20.
Colour of mix: neutral.
Consistency of the mix: viscous fluid.
Density of mix (kg/m³): 1500.
Viscosity of the mix (mPa·s): 1,100 ± 100 (# 3 - rpm 50).
Pot life: 30 min.
Application temperature range: from +8°C to +35°C.
Dust dry at +23°C and 50% R.H.: 6 hours.
Set to light foot traffic at +23°C and 50% R.H.: 24 hours.
Final setting time: 7 days.
Storage: 24 months in its original sealed packaging.
Application: flat American trowel or smooth trowel.
Consumption: 0.3-0.7 kg/m² per coat, depending on the absorbency and characteristics of the substrate.
Packaging: 20 kg kits (A+B); 5 kg kits (A+B).

Related documentation

Technical data sheet
Download

Last Projects PRIMER SN

Category icon SPORT FACILITIES

2017/2019

Puskas Arena

Budapest, Hungary

New building

Category icon RESIDENTIAL BUILDINGS

2018

Funnel House

Nilai, Malaysia

Resin floors application

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2020

Floor reconstruction in the shooting range

Stráž pod Ralskem, Czech Republic

Resin floors application

Category icon COMMERCIAL FACILITIES

2018

KEB Car Park

Lichfield Street, New Zealand

Resin floors application, Waterproofing

Keep in touch

Subscribe to our newsletter to get Mapei news