 Schoried, Switzerland
                                
                                    Schoried, Switzerland
                                
                             
                            | Yard | The bridge was repaired. | 
|---|---|
| Location | Schoried, Switzerland | 
| Subcategory | BRIDGE | 
| Application | The bridge, built in 1934, was repaired in 2020. | 
| Start and finish date | 2020 | 
| Application Type | Products for structural strengthening | 
| Installer companies | Bürgi Bau AG | 
| MAPEI Coordination | Stephan Moosmann | 
 
                                 
                                 
                                