Waitaki Aquatic Centre

Location icon Nieuw Zeeland
The aquatic centre had concrete decking around the pools that was slippery and absorbent and tracksite in the changing rooms that was delaminating. All mapei flooring product was mixed according to the technical date sheets. Tracksite antislip flooring was ground off existing concrete decking all decking was ground clean and vacuumed. Planiseal MR rolled out using 270mm/20mm nap roller sleeves. Quartz sand was broadcast into primer then left to cure. After curing excess sand was brushed, vacuumed then given a final brush. Mapefloor 300I was mixed and rolled out over sand with 270mm/10mm nap roller sleeves. Mapefloor finish 57 was applied within 24 hours on Mapefloor 300I with 270mm/7mm nap roller sleeves. All rolled coats where back rolled to achieve consistent application.

Projectgegevens

Gebruikte producten

GRANIRAPID
GRANIRAPID
Snel uithardende en -hydraterende twee-componenten cementlijm voor het…
KERAPOXY
KERAPOXY
Zuurbestendige, twee-componenten epoxy voegmiddel (beschikbaar in 17 kleuren)…
MAPEFLEX MS45
MAPEFLEX MS45
Overschilderbare hybride kit/lijm voor het afdichten van dilatatie-, aansluit-…
MAPECEM - Screed (Fast Set)
MAPECEM - Screed (Fast Set)
Product not available for this market,
contact us
MAPEFLOOR FINISH 57
MAPEFLOOR FINISH 57
Product not available for this market,
contact us
PLANISEAL MR
PLANISEAL MR
Product not available for this market,
contact us
2015 - MAPEFLOOR I 300 SL
MAPEFLOOR I 300 SL
Product not available for this market,
contact us

In contact blijven

Abonneer je op onze nieuwsbrief om nieuws over Mapei te ontvangen