Doi Inthanon

Location icon Chiangmai, Thailand

Construction

Additional Attachments

Here you can download all documents related to this project

Product used for the project

ADESILEX P10
ADESILEX P10
TECHNICAL DATA: Pot life of mix: more than 8 hours. Open time: ≥ 30 minutes.…
ISOLASTIC
ISOLASTIC
Flexible latex additive to be mixed with Kerabond, Kerabond T, Kerafloor and…
ULTRACOLOR PLUS
ULTRACOLOR PLUS
High-performance, anti-efflorescence, quick-setting and drying polymer-modified…
133 - FUGOLASTIC
FUGOLASTIC
Product not available for this market,
contact us
131 - KERACOLOR FF
KERACOLOR FF
Product not available for this market,
contact us
331 - MAPELASTIC
MAPELASTIC
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news