The aquatic centre had concrete decking around the pools that was slippery and absorbent and tracksite in the changing rooms that was delaminating. All mapei flooring product was mixed according to the technical date sheets. Tracksite antislip flooring was ground off existing concrete decking all decking was ground clean and vacuumed. Planiseal MR rolled out using 270mm/20mm nap roller sleeves. Quartz sand was broadcast into primer then left to cure. After curing excess sand was brushed, vacuumed then given a final brush. Mapefloor 300I was mixed and rolled out over sand with 270mm/10mm nap roller sleeves. Mapefloor finish 57 was applied within 24 hours on Mapefloor 300I with 270mm/7mm nap roller sleeves. All rolled coats where back rolled to achieve consistent application.
Ref #: 4722079475014260932
Category: TOURISM AND WELLNESS

Construction

Yard Main, learners, spa pools, pool deck & changing rooms (includes hallways and family changing rooms)
Location New Zealand
Subcategory Aquatic CentreSWIMMING POOL
Application Mapei systems for resin flooring and tiling swimming pools
Mapecem was used to fill holes in the concrete. Mape􀁾ex MS 45 silicone adhesive was used to fill control joints. Graniripid was used to replace broken tiles in pools.
Start and finish date 2020
Application Type Installation of floors, Resin floors application, Sealants application, Waterproofing
Installer companies Nehoff Precision Limited
Credits Sari Renee Photography
Project Manager Matthew Lanyon
MAPEI Coordination Scott Lacey
You may be interested in Aquatic Centre Sports Complex Swimming Pool

Product used for the project

GRANIRAPID

GRANIRAPID

DESCRIPTION: High performance, deformable, fast setting and hydration…
Ceramic
Internal
New Construction : No
KERAPOXY - Epoxy Grout

KERAPOXY - Epoxy Grout

DESCRIPTION: Two-component, acid-resistant epoxy mortar for grouting…
Ceramic
Internal
480m2
New Construction : No
MAPECEM - Screed (Fast Set)

MAPECEM - Screed (Fast Set)

DESCRIPTION: Special fast-setting hydraulic binder for the preparation of…
Internal
New Construction : No
MAPEFLEX MS 45

MAPEFLEX MS 45

DESCRIPTION: Paintable hybrid sealant and adhesive with a high modulus of…
Internal
New Construction : No
MAPEFLOOR FINISH 57

MAPEFLOOR FINISH 57

DESCRIPTION: Mapefloor Finish 57 is a four-component high solids,…
Internal
640m2
New Construction : No
MAPEFLOOR I 300 SL

MAPEFLOOR I 300 SL

Two-component, multi-purpose, neutral-coloured epoxy formulate for…
Internal
640m2
New Construction : No
PLANISEAL MR

PLANISEAL MR

Two component water based epoxy primer and moisture barrier suitable for…
Internal
640m2
New Construction : No

Keep in touch

Subscribe to our newsletter to get Mapei news