Yard | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Locație | Hérémence, Switzerland |
Sub-categorie | HOTEL |
Aplicație | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Data de început și de finalizare | 2022 |
Tipul aplicației | Floor/wall covering |
Arhitecți | Mijong Architecture Design |
Manager de proiect | Grande Dixence SA |
Coordonare MAPEI | Marcello Maieron |