Yard | Renovation and change of use of the premises of the physiotherapy practice. |
---|---|
Locație | Bex, Switzerland |
Sub-categorie | SPITAL |
Aplicație | The floor subfloors had to be levelled before installation. This was achieved by means of spot filling, vapour retarders and final smoothing. In addition, 320m² of LVT flooring was laid with Ultrabond Eco 4 LVT. |
Data de început și de finalizare | 2022 |
Tipul aplicației | Pardoseli |
Arhitecți | JME architecture SA |
Manager de proiect | Start.Physio |
Coordonare MAPEI | Marcello Maieron |