Yard | The Sahligut learning swimming hall was completely renovated. The overall renovation included a new chrome steel swimming pool and a new glass façade, the complete replacement of the pool water technology and the redesign of the cloakroom area. |
---|---|
Locație | Biel, Switzerland |
Sub-categorie | CENTRU ACVATIC |
Aplicație | The teaching pool at the Sahligut school was built between 1967 and 1968. After 50 years of operation, a comprehensive renovation was urgently needed. |
Data de început și de finalizare | 2021/2022 |
Tipul aplicației | Floor/wall covering |
Arhitecți | Leimer Tschanz Architekten AG, Viaduktstr. 33, 2501 Biel Natalie Wyss Architektin |
Manager de proiect | Stadt Biel/Bienne Tobias Grimm Architekt und Projektleiter |
Coordonare MAPEI | Pirmin Nünlist |