Contract HK/2009/01 WanChai Development Phase II (Central - WanChai bypass at Hong Kong Convention & Exhbition Centre)

Location icon Hong Kong
Ref. No.: 852332
Kategori: Altyapıları

İnşaat

Saha Wanchai
Konum Hong Kong
Alt kategori TUNNEL
Uygulama Waterproofing (8,000 m2)
Başlangıç ve bitiş tarihi 2014/2016
Uygulama Türü Underground constructıons
Müşteri Civil Engineering & Development Department, HKSAR
Yüklenici şirket Chun Wo - Leader Joint Venture
Tesisatçılar Hop Shing Waterproof Construction Co. Ltd.
Mimarlar AECOM Asia Co. Ltd.
MAPEI Distribütörü Mapei China Ltd.
Açıklama Along the coastline at Wan Chai North and North Point, the cut and cover tunnel was built and it needs a high-performance waterproofing system to ensure a safe and efficient transport facilities to public. Purtop 400M HK was proposed to protect the 8,000 sq.m tunnel from any leakages.

Proje için kullanılan ürün

PRIMER SN
PRIMER SN
İki bileşenli, dolgulu epoksi astar. TEKNİK BİLGİ: Karışım oranı: A bileşeni :…
7608
7608
Ürün bu pazar için mevcut değil,
bizimle iletişime geçin
417 - MAPEFLEX PU45
MAPEFLEX PU45
Ürün bu pazar için mevcut değil,
bizimle iletişime geçin

İrtibatta olalım

Mapei'den haber almak için bültenimize abone olun