Sabah Ammonia Urea Plant

Location icon Sipitang, Malaysia
Ref. No.: 60000036
Kategori: ÜRETİM TESİSLERİ

İnşaat

Saha Sabah Ammonia Urea Plant
Konum Sipitang, Malaysia
Alt kategori PLANT
İnşa edildiği tarih: 2014
Açıldığı tarih: 2015
Uygulama Tank Lining & Waterproofing
Uygulama Türü Waterproofıng
Müşteri Petronas Chemicals Group Berhad
Yüklenici şirket Mitsubishi Heavy Industries / Apex Energy Sdn Bhd / PT Rekayasa Industri Consortium
Tesisatçılar Hycrete Mecure Sdn Bhd
Mimarlar Architect HaoYun
MAPEI Distribütörü Mapei Malaysia Sdn Bhd
Açıklama Construction of Petronas Chemicals Group Bhd’s Ammonia Urea Complex in Sipitang- Sabah started in mid-2012. The RM5 billion BEPCC contract – Basic and Detailed Engineering, Procurement, Construction and Commissioning – was undertaken by a consortium comprising Mitsubishi Heavy Industries, Apex Energy Sdn Bhd and PT Rekayasa Industri.

The SAMUR Project involves the development of a new fertiliser plant with urea production capacity of 1.2 million metric tons per annum (mmtpa). The plant will be located on 166 acres of land in the Sipitang Industrial Park, Sabah.

Also known as the SAMUR Project, the complex located in the Sipitang Oil & Gas Industrial Park comprises an ammonia plant, a urea plant, a granulation plant, integrated utility units and jetty facilities.

Completion is scheduled for February, 2016.

Besides waterproofing for the roof slab, a highly chemical-resistant and abrasion-resistant lining was required for the ammonia processing plant’s cooling tower.

Mapei Products: PRIMER SN, MAPECOAT VE825 AP, MAPETEX GRP225, PLASTIMUL MY, MAPETHENE TA 3MM

Proje için kullanılan ürün

PRIMER SN
PRIMER SN
İki bileşenli, dolgulu epoksi astar. TEKNİK BİLGİ: Karışım oranı: A bileşeni :…
2170
2170
Ürün bu pazar için mevcut değil,
bizimle iletişime geçin
561
561
Ürün bu pazar için mevcut değil,
bizimle iletişime geçin
942
942
Ürün bu pazar için mevcut değil,
bizimle iletişime geçin

İrtibatta olalım

Mapei'den haber almak için bültenimize abone olun