MAPECOAT I 600W

Two-component transparent epoxy primer in water dispersion.
TECHNICAL DATA:
Consistency of mix: fluid.
Colour of mix: opaline.
Mixing ratio: comp. A: comp. B = 2.3 : 3.6.
Workability time: 2-3 hours.
Dust dry at +23°C and 50% R.H.: 3-4 hours (first coat); 6-8 hours (second coat).
Final hardening time: 7 days.
Application temperature range: from +8°C to +35°C.
Storage: 24 months in its original sealed packaging.
Application: roller, spray or airless spray.
Consumption: 300-500 g/m² according to the absorption.
Packaging: 5.9 kg kits (A + B).

İlgili belgeler

Teknik veri sayfası
İndir

Son Projeler MAPECOAT I 600W

Category icon KONUT İNŞAATLARI

2017/2019

Jardins de la Pâla, Bulle

Bulle, Switzerland

Cemetitious and resin floor coverings

Category icon SPOR TESİSLERİ

2019

RIVERSIDE TENNIS AND NETBALL CENTRE RECONSTRUCTION

Ascot Vale (Melbourne), AVUSTRALYA

Solutıons for sports floorıng, Surface preparatıon

Category icon ÖZEL PROJELER

2018/2019

Jihoslovanské mauzoleum jugoslávských vojínu

Olomouc, Czech Republic

Waterproofıng, Structural reınforcement, Masonry restoratıon, Concrete restoratıon, Facades maıntenance

Category icon KONUT İNŞAATLARI

2018

Impermeabilizzazione lastrico con Purtop 400 M

CASOLI, Italy

Waterproofıng

İrtibatta olalım

Mapei'den haber almak için bültenimize abone olun