MAPECOAT I 600W

Two-component transparent epoxy primer in water dispersion.
TECHNICAL DATA:
Consistency of mix: fluid.
Colour of mix: opaline.
Mixing ratio: comp. A: comp. B = 2.3 : 3.6.
Workability time: 2-3 hours.
Dust dry at +23°C and 50% R.H.: 3-4 hours (first coat); 6-8 hours (second coat).
Final hardening time: 7 days.
Application temperature range: from +8°C to +35°C.
Storage: 24 months in its original sealed packaging.
Application: roller, spray or airless spray.
Consumption: 300-500 g/m² according to the absorption.
Packaging: 5.9 kg kits (A + B).

İlgili belgeler

Teknik veri sayfası
İndir

Son Projeler MAPECOAT I 600W

Category icon SPOR TESİSLERİ

2019

RIVERSIDE TENNIS AND NETBALL CENTRE RECONSTRUCTION

Ascot Vale (Melbourne), AVUSTRALYA

Solutıons for sports floorıng, Surface preparatıon

Category icon KONUT İNŞAATLARI

2018

Impermeabilizzazione lastrico con Purtop 400 M

CASOLI, Italy

Waterproofıng

Category icon TİCARİ TESİSLER

2017/2018

Mapletree Logistics Hub

Port of Tanjung Pelepas, Malaysia

Installatıon of floors, Cemetitious and resin floor coverings

Category icon SPOR TESİSLERİ

2019

Yuk Chai Primary School Basketball Court

Petaling Jaya, Malaysia

Solutıons for sports floorıng

İrtibatta olalım

Mapei'den haber almak için bültenimize abone olun