MAPEWRAP 31

Two-component, medium-viscosity epoxy adhesive for impregnating MAPEWRAP using the “dry system”.
TECHNICAL DATA:
Mixing ratio: comp. A : comp. B = 4 : 1.
Workability time: 40 minutes (at +23°C).
Bond strength to concrete: > 3 N/mm² (after 7 days at +23°C - failure of substrate).
Brookfield Viscosity: 7,000 mPa•s (rotor 3 - 5 revs).
Classification: EN 1504-4.
Consumption: according to the type and width of the fabric.
Packaging:
5 kg kits:

  • 4 kg drums (comp. A);
  • 1 kg drums (comp. B).

İlgili belgeler

Teknik veri sayfası
İndir

Son Projeler MAPEWRAP 31

Category icon KAMU BİNALARI VE KENTSEL TASARIM

2019/2020

“Vienybės” square Lithuania

Kaunas, LITHUANIA, Norway

Structural reınforcement, Roadıng

Category icon KAMU BİNALARI VE KENTSEL TASARIM

2018/2019

Public Toy Library

Castrì di Lecce, Italy

Facades maıntenance, Structural reınforcement

Category icon KAMU BİNALARI VE KENTSEL TASARIM

2017/2018

Fusco Theatre

Taranto, Italy

Cemetitious and resin floor coverings, Structural reınforcement

Category icon KONUT İNŞAATLARI

2018

Valva condominium

Valva, Italy

Structural reınforcement

İrtibatta olalım

Mapei'den haber almak için bültenimize abone olun