TRIBLOCK P

Three-component epoxy-cementitious primer for non-absorbent waterproofing damp substrates.
TECHNICAL DATA:
Consistency: comp. A liquid; comp. B liquid; comp. C powder.
Colours: comp. A white; comp. B white; comp. C white.
Mixing ratio: comp. A : comp. B : comp. C = 12 : 38 : 50.
Workability time: 30-40 minutes.
Waiting time between first and second coat: 4-6 hours.
Waiting time before laying floors or applying smoothing compound: 18 hours.
Maximum waiting time before laying floors or applying smoothing compound: 7 days.
Storage: 24 months.
Application: brush or roller.
Consumption: 0.5 kg/m².
Packaging: 5 kg drums (A+B+C).

İlgili belgeler

Teknik veri sayfası
İndir

Son Projeler TRIBLOCK P

Category icon SPOR TESİSLERİ

2018

Fijlkam Olympic Centre

Ostia, Italy

Solutıons for sports floorıng

Category icon KAMU BİNALARI VE KENTSEL TASARIM

2017/2018

Studio Legale Neri

Ostia Lido, Italy

Waterproofıng

Category icon SPOR TESİSLERİ

2019

Gualdo Cattaneo multisport court

Gualdo Cattaneo, Italy

Solutıons for sports floorıng

İrtibatta olalım

Mapei'den haber almak için bültenimize abone olun