Projects
From Terminal 1 to the air traffic control tower: Mapei products in the world’s largest airport world.
| Yard | terminal and air traffic control tower |
|---|---|
| Location | Istanbul, Turkey |
| Subcategory | AIRPORT |
| Built in | 2016 |
| Opened in | 2028 |
| Application | supply of products for substrate preparation, waterproofing surfaces in tanks and terraces, chemical anchoring, installing and grouting ceramic tiles, sealing joints, coating walls |
| Start and finish date | 2016/2018 |
| Application Type | Anchoring, Floor/wall coverings, Waterproofing systems |
| Client | IGA-Istanbul Great Airport |
| Contractor company | CMLKK JV - Cengiz Mapa Limak Kolin Kalyon Joint Venture |
| Installer companies | Umut Yalitim |
| Architects | Nordic Office-Grimshaw-Haptic Architecture; Pininfarina-Aecom |
| MAPEI Distributor | Umut, Himerpa, Pelenkoglu |
| Project Manager | Horizontal |
| MAPEI Coordination | Emrah Karatas, Mapei Yapi Kimyasallan A.S (Turkey) |
Here you can download all documents related to this project