Yard | Epic Systems Corporate Campus |
---|---|
Location | Madis, USA |
Subcategory | School |
Application | Epic Systems Corporate Campus |
Application Type | New Building, Admixtures for Concrete |
Contractor company | J.H. Findorff & Son, Inc. |
Architects | Cuningham Group & Zimmer Gunsul Frasca Architect |
Other |
Project Engineer: Magnusson Klemincic Ready Mix Supplier: Wingra Redi-Mix Project Facts: Unique award winning project located on 350 acres of rolling hills near Madison, WI. Project includes a three-story office building structured over a below grade, three-level post-tensioned underground parking ramp. Due to occupancy requirements by the owner, four office buildings and one parking ramp were constructed on a parallel schedule instead of a consecutive schedule. This fast track schedule entailed using high performance concrete to ensure the schedule was met. This project utilized 35,000 cy of poured in-place concrete. 20 different mix designs were used throughout this project. |
Toll-free within Canada:
Technical Services at 1-800-361-9309
Customer Service at 1-800-668-1212
Copyright © 2025 MAPEI Inc. All rights reserved.
2900, avenue Francis-Hughes, Laval (Québec) H7L 3J5