Yard | The bridge was repaired. |
---|---|
Location | Schoried, Switzerland |
Subcategory | Bridge |
Application | The bridge, built in 1934, was repaired in 2020. |
Start and finish date | 2020 |
Application Type | Products for Structural Strengthening |
Installer companies | Bürgi Bau AG |
MAPEI Coordinator | Stephan Moosmann |