| Chantier | train repair hangar |
|---|---|
| Lieu | Basel, Suisse |
| Sous-catégorie | Train |
| Application | The SBB train repair hall was extended and the floor had to be recoated. The floor at platform level was coated with Mapecoat TNS Extreme, as a large part of the surface consisted of tamped asphalt slabs. The working pits were coated with Mapecoat I 24. |
| Date de début et de fin | 2023 |
| Type d’application | PRÉPARATION DES SUPPORTS |
| Installateurs | Anliker AG, Birsfelden |
| Spécialistes impliqués | SBB |
| Coordonnateur MAPEI | Roger Mohler |